Respond, Restore, & Renew – Capital Campaign

RESPOND, RESTORE, & RENEW

The Respond, Restore, & Renew capital campaign sought to address serious heating/cooling, electrical, and plumbing problems in St. Brendan's church/rectory. This helped preserve the integrity of our buildings, lower utility costs, and ensure that our church building remains a healthy place to worship in the long-term.

This campaign runs from September 2020 - September 2023 with an original goal of $550,000.

Due to unforeseen expenses and circumstances, and change orders, the total cost ended up being $649,619.89.

 

Thank you to those who have fulfilled your committments and most especially those who then continued to give toward this cause over and above their normal tithe to the Parish.

Our total received gifts specifically toward this project have been $615,915.73!  GOD BLESS YOU!

Please, for those who have not done so (180 of our roughly 450 registered households have zero recorded treasure giving for the year 2022) consider supporting the work and ministry of St. Brendan, by making a sacrificial donation based on your income to the parish.  That alone would make a tremendous difference.  If you are able and so moved, donating over and above that in a one time or ongoing donation toward the RRR would also be a great help for us to continue to provide as much ministry in our parish as possible!

Pledged: $547,016.00

Received: $593,360.09

Actual Cost of RRR: 649,619.89

(as of Nov 13, 2022)
Thank you for supporting St. Brendan!

Progress Photos

 

 

Specifics of the Proposal

The church and rectory systems will be separated. The church systems will be given the capacity to accommodate expansion in the future. The rectory systems will be divided into its three levels for greater efficiency.

Church:

  • 12 new Heating and Cooling units
  • 1 new ventilation unit to improve building indoor air quality
  • Over 560 feet of new copper piping for refrigerant lines to new HVAC units
  • Over 300 feet of new copper water piping to sinks and restrooms
  • Two new accessible restrooms and more open entryway
  • Four new point-of-use electric water heaters
  • One new 400 amp, 3 phase electrical service entrance with a new MDP panel
  • Replacement of one existing 200 amp electrical panel

Rectory:

  • 15 new Heating and Cooling units
  • Over 540 feet of new copper piping for refrigerant lines to new HVAC units
  • New copper hot water lines, new copper cold water lines, and new PVC waste lines for plumbing to replace any exposed plumbing lines
  • New plumbing fixtures in one of the third floor restrooms
  • One new 400 amp, 3 phase electrical service entrance with a new MDP panel
  • Replacement of three existing 200 amp electrical panels